PNR RailWorks Quebec Inc. rehabilitated the track at the ore loading station.
Project Highlights 
  • Removed track and switches
  • Installed new ties, rail, switches and surfaced track
  • Completed all work in tight work windows
Labrador, Quebec
Customer 
QNS&L Railway
Project Description 

PNR RailWorks Quebec Inc. rehabilitated the track infrastructure during the annual shutdown at the Iron Ore Company’s automatic ore loading station.

Project Scope 

PNR RailWorks removed track and switches and reinstalled new ties, rail and switches and surfaced the track.

The Iron Ore Company’s ore loading station is the heart of operations and cannot be out of commission for a long period. To accommodate this operational requirement, all work was completed in 86 hours, well within the designated 96-hour work window.

Unique Features 

Tight work windows and the job site conditions presented a number of project challenges. PNR RailWorks worked in close partnership with the client to complete the project safely and on time. Because catenary lines were directly over the project site, the PNR RailWorks project team took extra precautions to thoroughly plan work and conduct safety briefings to address the work site environment.